Truss Bridges & Heavy Structures
A Deliberate Expansion into Large-Scale Structural Systems
Whitmore Steel is expanding into truss bridges and heavy structural systems as a natural extension of our structural steel fabrication expertise.
What We Build
Our focus includes:
- Pedestrian and campus truss bridges
- Elevated walkways and connector structures
- Steel truss assemblies for pedestrian, campus, and utility spans
- Utility and industrial access bridges
- Heavy structural framing requiring controlled fabrication
Structural Steel First
Self-Performed Structural Steel. Fabrication-Led Bridge Execution.
Whitmore Steel approaches truss bridge projects as fabrication-led structural systems, not field-assembled components. By self-performing the primary steel scope, Whitmore maintains dimensional control, connection accuracy, and predictable erection outcomes on constrained or occupied sites.
This approach enables:
- Predictable connection geometry and fit-up
- Controlled fabrication quality under AISC standards
- Reduced field risk during erection
- Cleaner coordination with foundations, bearings, and access systems
How We Deliver
Whitmore Steel delivers truss bridge projects under a GC-led or Owner-led delivery model, providing disciplined structural scope without introducing unnecessary risk.
Delivery model includes:
- Structural steel fabricated and trial-fit by Whitmore Steel
- Engineer of Record engaged through owner or GC
- Shop-verified assemblies prior to shipment
- Sequenced delivery aligned with erection plans
- No field modifications without Whitmore Steel approval
Ideal Applications
- University and corporate campuses
- Hospital and healthcare campuses
- Private industrial and logistics facilities
- Institutional or civic pedestrian crossings
- Secure or operational sites requiring off-site fabrication
* Primary Execution focus: California and Arizona | Fabrication support: Nationwide (project-specific)
FAQ
What truss bridge services does Whitmore Steel provide?
Whitmore Steel fabricates and erects structural steel truss assemblies for private and institutional pedestrian bridge applications, including connection detailing and shop-verified fabrication. These services extend Whitmore Steel’s long-standing structural steel fabrication and erection experience into adjacent applications requiring tighter coordination and controlled execution.
What types of truss bridge projects does Whitmore Steel support?
Campus and institutional pedestrian bridges, private crossings, utility access bridges, and short- to medium-span truss structures for non-DOT applications.
How is seismic compliance addressed for truss bridges?
Structural steel is fabricated in accordance with AISC standards and detailed by the project’s Engineer of Record to meet applicable CBC and IBC requirements.
What are the benefits of a fabrication-led truss bridge approach?
Off-site fabrication improves dimensional accuracy, reduces field risk, and allows faster erection compared to site-assembled bridge systems.
Does Whitmore Steel pursue publicly funded DOT bridge projects?
Whitmore Steel focuses on private, campus, and institutional bridge applications and does not act as a prime contractor for public highway bridge programs.
Where does Whitmore Steel perform this work?
Whitmore Steel fabricates structural steel assemblies in AISC-certified facilities and executes erection through regionally aligned project teams, coordinated with GC delivery plans and project requirements.